providing power infrastructure by laying 33kv single circuit one side and 11kv single circuit other side (as double circuit) on 12.5m spun poles with span of 40 m with 100 sq.mm aaac dog conductor at 2nd de-notified area for a length of 7.6km at western sector, atchutapuram, visakhapatnam(3rd call).