retrofitting of piped water supply scheme under jjm at village sundara block panna based on tw. i.c. construction of 50kl rcc oht, 20kl sump well cum pumphouse, pipeline, etc including cost of all material and labour with 90days trialrun commissioning period of entire scheme.- pipe laying works.