Anti Corrosive Treatement×Crane×Crane×Painting Work×Structure Work×Painting×
MINISTRY OF DEFENCE
TENDERS DETAILS
crane 2 ton portable which is used during fitment and removal of avro aircraft engine and propeller. to prevent further deterioration, repair work is required to be carried out including replacement of supporting structures, anti-corrosive painting and load testing to ascertain its capacity after repair.-(i) repair/replacement of damage structural parts. (ii) anti corrosive painting to be done. (iii) proof load testing along with load certificate of crane to be carried out.