construction of 4 no. single line bg tunnels (approx total length 1200 rm) between km28.300 to km 35.100 including 50m cutting on each face of all tunnel for opening of face inconnection with construction of new bg rail line from koderma to tilaiya under jurisdictionof dy.ce/c/dhnbidding type normal tender .