design, build and operate 1.5 mld sewerage treatment plant on sbr technology with scada/plc system including survey, design, layout and construction of underground sewarage network of approx. 8656 mtrs length with all apputtenant structures and allied works of stp, sewarage network, pumping station and riser mains