restoration of damaged road surface due to the cause of earthwork in connection with placement of underground water pipe lines in stretches at pandabeswar-natundanga road from ch. 0.000 km to 2.000 km, 2.500 to 3.000 km, 5.500 to 5.800 km, 7.900 km t