disconnection of air hoses and brake releasing in all the loaded coal wagons received at mtps for unloading of coal and checking formation of empty coal rakes in dispatch line to ensure all the wagons side doors in closed condition after formation to release empty rakes to railways for 250 rakes (or) 120 days from the date of commencement of work whichever is earlier .