earth work excavation, stub setting,concreting, erection of tower, restringing of 3 nos panther conductor, 1 no gi earth wire 7/3.55 mm at existing 110 kv sc line of k.r.thoppur to thumbipadi 110 kv ss in location 49 improve the ground clearance omal