excavation in foundation in ordinary soil ( loam clay or sand) lift up to 1.50m and lead up to 30m and including filling watering and ramming of excavated earth into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by engineer in charge up to a distance of 30m from the foundation trenches including all t&p phowarah and basket etc. complete.